Money Controls Merges Two UK Production SitesThis article comes from Highwaygames.com ![]() The production of Money Controls' diverse and high quality product range requires an extremely complex environment and customers demand short and demanding lead times. Therefore time which could be allocated to the move was limited and a plan was drawn up to ensure the project was completed within two weeks – the absolute maximum time that production could be halted at Unit 2. Before the plan could be implemented, the floor at the main site had to be reinforced to withstand the machinery from Unit 2. This took four months to complete. Then began the mammoth task of moving 20 injection moulding machines, over 400 individual tools and more than 500 individual part numbers. The task was further complicated by the fact that there was a limitation on what stock could be put in place due to both space restrictions and cash flow implications for the business. "It was imperative that this move was completed smoothly and to deadline so a detailed consultation process was undertaken with the employees throughout the project," said Mr Wood. "There is no doubt that without their co-operation, support and enthusiasm the move would not have taken place, as it did, on time, to budget and without letting any customers down." https://www.highwaygames.comhttps://www.highwaygames.com/arcade-news/money-controls-merges-two-uk-production-sites-1572/ Copyright © 1999 - 2025, Highwaygames.com All Rights |